TPP-HP Novi Sad

Basic Information
TPP-HP Novi Sad is the largest of the three power plants of the business organization. It is located in the northern industrial zone, on the Danube river bank, only 5 km from the city centre. Installed capacity of the annual production of electric energy amounts up to 1.500.000 MWh. It is characterized by a fast start-up when the need exists and the supply of peak, electrical energy.
TPP-HP Novi Sad provides thermal energy to the district heating system of Novi Sad, with which it is connected via hot-water pipeline, 3,2 km long and of 900 mm diameter. It participates in heating of the city’s 50.000 residential and business units, which represents over 60% of the total consumers in district heating system of Novi Sad. Available capacities are sufficient to supply existing, but also designed, future requirements of Novi Sad in regards to heating.
Branch Manager is Slobodan Lakić, B.Sc.Mech.Eng. Technical manager of the branch is Dragan Tomić, B.Sc.Mech.Eng.

Technical Capacities
Boilers:
- two boilers of 420 t/h, 560°C, 13,77 Mpa each
- a boiler of 500 t/h, 560°C, 13,77 Mpa
Turbine:
- PT 135/165-15-4
- nominal electric power 135 MW
- maximum electric power 165 MW
- thermal capacity for heating 128 MWt
- technological steam 320 t/h
- Т 110/120-130-4
- nominal electric power 110 MW
- maximum electric power 120 MW
- thermal capacity for heating 204 MWt.
Natural gas or fuel oil are used as fuel.
………………………………………………………………………………….

Branch Manager
Slobodan Lakić, B.Sc.Mech.Eng
………………………………………………………………………………….

Technical manager of the branch
Dragan Tomić, B.Sc.Mech.Eng.