Panonske Thermal Power Plant-Heating Plant
Business Organization „Panonske termoelektrane-toplane” d.o.o. Novi Sad operates under the aegis of the Public Еnterprise „Electric Power Industry of Serbia“ as a dependent business organization; together with its three branches in Novi Sad, Zrenjanin and Sremska Mitrovica it plays а significant role in supplying Serbia, Vojvodina and Novi Sad with electric and thermal energy.
We produce electric and thermal energy
The plants produce energy in a modern, co-generation process that enables the saving of primary fuel – natural gas or fuel oil – up to 25% in relation to separated production of electricity and heat. Total nominal installed capacity is:
424 MW (megawatts) electric power
505 (t) MW (megawatts) thermal power
860 t/h (tons per hour) technological steam for process industry.
Cogeneration process saves primary fuel
Use of natural gas as primary fuel excludes Panonske termoelektrane-toplane d.o.o. Novi Sad from a group of large environmental contaminants. With further modernization of its capacities and by applying European standards, reduction of the pollutant emission continues.
We protect environment
Out of many prizes and awards, the ones that stand out are: Golden Medal of Quality, which Panonske TE-TO were awarded two years in a row by the Novi Sad Fair (in 2007 and 2008), and “Kapetan Miša Anastasijević” award in category “The Road to the Top”.
Info
-
Panonske termoelektrane-toplane – we produce electric energy for the electric energy system of Serbia and thermal energy for district thermal plants in Novi Sad, Zrenjanin and Sremska Mitrovica. Our direct customers are JP Elektroprivreda Srbije and district thermal plants and not the individual consumers. Our name, however, occasionally misleads citizens, who by mistake contact us when having remarks on heating quality and price.
-
TPP-HP Novi Sad
is the largest of the three power plants of the business organization. It is located in the northern industrial zone, on the Danube river bank, only 5 km from the city centre. Installed capacity of the annual production of... Find out more
-
TPP-HP Zrenjanin
Thermal Power Plant-Heating Plant (TPP-HP) Zrenjanin, the second facility according to size and production potential, is located in the industrial zone of Zrenjanin, 4 km away from the city centre and in close vicinity of... Find out more
-
TPP-HP Sremska Mitrovica
According to its size and capacity, TPP-HP in Sremska Mitrovica is the smallest power facility in the scope of Business Organization “Panonske termoelektrane-toplane” d.o.o. Novi Sad. It is located on the left bank of... Find out more




